//Quick answer
- The contractor pulls the permit when one is required.
- Permit cost varies by job and is passed through; no flat figure is published.
- In an emergency, permits can be acquired quickly under emergency conditions.
- Dee Alkouri, General Manager, is the operational authority on permits and scheduling.
01Definition
What does Done-Rite actually do on a permitted job?
Confirm which authority has jurisdiction for your address. Apply for the permit before the work starts. Do the work to the adopted code. Schedule the inspection at the right stage, meet the inspector, and correct anything on the list. Close the permit and give you the record. On a water heater that is one visit and one inspection; on a repipe it is a rough-in and a final.
What is the one thing we check before every inspection?
In Done-Rite's field experience, the most common thing an Orange County inspector flags on a permitted plumbing job is a missing carbon monoxide alarm, so the crew checks for one before scheduling the inspection. That is field experience with local inspectors, not a statement of what the code requires: the California Residential Code (R315.2.2) exempts installation, alteration and repair of plumbing systems from the carbon monoxide alarm trigger.
02When it applies
Which jobs get this treatment?
Water heater replacement and tankless installation (usually), sewer line replacement and trenchless work (yes), whole-house repiping (yes), gas line work (usually), and slab leak repairs or water treatment installs where the scope requires it (varies). Drain cleaning, hydro jetting, leak detection and most fixture repairs do not need a permit.
What does it cost and how long does it take?
The permit fee varies by job and by jurisdiction and is passed through on the invoice. Timelines vary by department. Done-Rite does not publish a figure for either because each building department sets its own. In an emergency, the permit does not hold up the repair.
03What goes wrong
What happens if the inspection flags something?
It gets fixed and re-inspected. Corrections on Done-Rite's own work are Done-Rite's to make. The 1 year minimum labor warranty applies to the work regardless.
04Proof
- When a job needs a permit, Done-Rite pulls it and schedules the inspection.
- California CSLB C-36 licence #998069. Licensed, bonded and insured, with workers compensation.
- Six plumbers averaging more than 9 years in the trade each, plus a General Manager with 25+ years.
- 4.9 stars across 1,720+ Google reviews on the Orange profile, checked September 17, 2026.
- 1 year minimum warranty on labor. Manufacturer warranty handling varies by manufacturer.
05Action
Book the job; the permit is part of it
Call (714) 605-2950 or request a quote. Tell the office what the job is and they will say whether a permit is likely. No trip charge, 1-hour response, 24/7 for emergencies.
//Please read
Educational guidance, not legal advice. Permit and code requirements are set by the building department with jurisdiction over your address and change on adoption cycles. Confirm current requirements with your city's building department before acting on anything here. Done-Rite pulls the permit when a job requires one.
Authority cited: the California Residential Code as adopted by your city, and California Business and Professions Code section 7030.5 (licence display). Reviewed by Dee Alkouri, General Manager, Done-Rite Plumbing & Rooter. Re-review trigger: any code adoption cycle or a change in Done-Rite's permit practice.
//Keep going
Learn
//Terms used in this guide
Where this applies
Done-Rite runs these calls across Orange County from its shop in Anaheim, CA, with no trip charge in any city it serves.
Common questions
If you are unsure, it is best to give us a call. There are many things that require a permit that you wouldn't think of.
Done-Rite does, when one is required. The cost varies by job.

